Power electronics for equipment manufacturers & integratorsinfo@voluxin.com+86 15957148220
Request a Quote ↗

VOLUXIN · POWER & BATTERY MANAGEMENT

Engineering resources

Selection guides, English product overviews and project requirements.

BA48-MNS11 — BMS catalogue reference
350V DC-DC Converter Range — DC-DC catalogue reference

VOLUXIN ENGINEERING REFERENCE

Sample approval record template

A blank working framework for test methods, acceptance criteria, results and revision approval.

← All engineering references

Download CSV

Read the table below. On small screens, scroll horizontally to view every column. Download the CSV to edit a worksheet in your spreadsheet application.

Sample approval record template — Revision 2, 5 October 2026
Review itemRequirement to specifyYour target / notes
ScopeBMS/DC-DC configuration or PCB revision; agreed options; intended applicationTo be provided by customer
RequirementEach approved requirement and its measurable acceptance limitTo be provided by customer
MethodSetup; instrument identification; calibration status; measurement procedureTo be provided by customer
ConditionsInput/load; ambient/cooling; pack or board construction as applicableTo be provided by customer
ResponsibilitiesParty providing sample; party performing test; approval contactTo be provided by customer
Observed resultsMeasured values and units; files/photos; date; responsible personTo be provided by customer
DeviationsOpen issues; decision; corrective action; required re-testTo be provided by customer
Release decisionPass/conditional/reject decision against agreed criteria; authority/dateTo be provided by customer
Repeat supplyApproved revision; retained records; change-notification and approval processTo be provided by customer

VOLUXIN | Rev 2 | 2026-10-05 | Customisation requirements worksheet; targets are customer inputs, not confirmed product specifications or test results.

Prepare a sample approval plan

Agree the proposed configuration, evaluation method and acceptance criteria before sample testing. Record measured results only after the evaluation takes place.

BMS project enquiry · DC-DC project enquiry · PCB project enquiry ·

Catalogue references and blank worksheets support project discussions. They are not configuration-specific engineering specifications or completed test records.

Discuss Your Requirements